| MOQ: | PC 1 |
| Precio: | $5000-$50000 |
| Standard Packaging: | caja de la madera contrachapada |
| Delivery Period: | 10 -15 días laborables |
| Payment Method: | LC, T/T, Western Union, D/A, D/P |
| Supply Capacity: | 100 unidades por mes |
| Capacidad (kg) | FEM | ISO | Altura (m) | Velocidad (m/min) | Velocidad del Carro (m/min) | Tamaño H (mm) | Tamaño C (mm) |
|---|---|---|---|---|---|---|---|
| 1000 | 4m | M7 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 1250 | 3m | M6 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 1600 | 3m | M6 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 1600 | 2m | M5 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 660 |
| 2000 | 2m | M5 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 2000 | 3m | M6 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 660 |
| 2500 | 3m | M6 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 2500 | 2m | M5 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 660 |
| 3200 | 2m | M5 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 3200 | 1Am | M4 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 660 |
| 5000 | 2m | M5 | 6/9/12/18 | 0.8/5.0 | 5~20 | 321 | 590 |
| 5000 | 2m | M5 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 790 |
| 6300 | 1Am | M4 | 6/9/12/18 | 0.8/5.0 | 5~20 | 321 | 590 |
| 8000 | 3m | M6 | 6/9/12/18 | 0.8/5.0 | 5~20 | 254 | 740 |
| 10000 | 2m | M6 | 6/9/12/18 | 0.8/5.0 | 5~20 | 321 | 740 |
| 10000 | 3m | M4 | 6/9/12/18 | 0.6/4.0 | 5~20 | 364 | 850 |
| 12500 | 1Am | M5 | 6/9/12/18 | 0.8/5.0 | 5~20 | 321 | 740 |
| 12500 | 2m | M5 | 6/9/12/18 | 0.6/4.0 | 5~20 | 404 | 850 |
| 16000 | 2m | M4 | 6/9/12/18 | 0.6/4.0 | 5~20 | 404 | 850 |
| 20000 | 1Am | M5 | 6/9/12/18 | 0.6/4.0 | 5~20 | 404 | 850 |
| MOQ: | PC 1 |
| Precio: | $5000-$50000 |
| Standard Packaging: | caja de la madera contrachapada |
| Delivery Period: | 10 -15 días laborables |
| Payment Method: | LC, T/T, Western Union, D/A, D/P |
| Supply Capacity: | 100 unidades por mes |
| Capacidad (kg) | FEM | ISO | Altura (m) | Velocidad (m/min) | Velocidad del Carro (m/min) | Tamaño H (mm) | Tamaño C (mm) |
|---|---|---|---|---|---|---|---|
| 1000 | 4m | M7 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 1250 | 3m | M6 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 1600 | 3m | M6 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 1600 | 2m | M5 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 660 |
| 2000 | 2m | M5 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 2000 | 3m | M6 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 660 |
| 2500 | 3m | M6 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 2500 | 2m | M5 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 660 |
| 3200 | 2m | M5 | 6/9/12 | 0.8/5.0 | 5~20 | 232 | 500 |
| 3200 | 1Am | M4 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 660 |
| 5000 | 2m | M5 | 6/9/12/18 | 0.8/5.0 | 5~20 | 321 | 590 |
| 5000 | 2m | M5 | 6/9/12/18 | 1.6/10.0 | 5~20 | 254 | 790 |
| 6300 | 1Am | M4 | 6/9/12/18 | 0.8/5.0 | 5~20 | 321 | 590 |
| 8000 | 3m | M6 | 6/9/12/18 | 0.8/5.0 | 5~20 | 254 | 740 |
| 10000 | 2m | M6 | 6/9/12/18 | 0.8/5.0 | 5~20 | 321 | 740 |
| 10000 | 3m | M4 | 6/9/12/18 | 0.6/4.0 | 5~20 | 364 | 850 |
| 12500 | 1Am | M5 | 6/9/12/18 | 0.8/5.0 | 5~20 | 321 | 740 |
| 12500 | 2m | M5 | 6/9/12/18 | 0.6/4.0 | 5~20 | 404 | 850 |
| 16000 | 2m | M4 | 6/9/12/18 | 0.6/4.0 | 5~20 | 404 | 850 |
| 20000 | 1Am | M5 | 6/9/12/18 | 0.6/4.0 | 5~20 | 404 | 850 |